200 mm300 mmIPE 300S355JR · 42.2 kg/m
Steel Structures · Prefabricated Halls · Towers

Building the future.
with steel.

EN 1090 certified production. From the first blueprint to handover — RAKUŠIĆ Corporation is your single partner for steel structures, prefabricated halls, and telecom towers.

Calculate Hall Price

Engineering • Manufacturing • Assembly — all under one roof.

0+
Projects
0+
Workers
0
EU branches
0h
To 3D blueprint
EN 1090 Certified1500+ Projects50 m SpanISO 900124h To 3D Blueprint3 EU BranchesISO 3834HR | AT | CH100+ ExpertsS355 SteelEurocode 3CE MarkingEN 1090 Certified1500+ Projects50 m SpanISO 900124h To 3D Blueprint3 EU BranchesISO 3834HR | AT | CH100+ ExpertsS355 SteelEurocode 3CE Marking

Complete cycle

Fromidea.Todesign.Tosteel.Tobuilding.Tofuture.

Sound familiar?

5 subcontractors or 1 Rakušić? The math is clear.

Traditional approach
6-12 months waiting for a finished building
5-10 subcontractors — who is responsible?
Designer doesn't know production
Hidden costs and overruns
Questionable certificates and documentation
Limited spans (up to 12 m concrete)
Impossible disassembly and relocation
With Rakušić Corporation
Finished building in 2-3 months — not 12
1 partner, 0 subcontractors — full responsibility
Same team designs and produces — zero errors
Fixed price, transparent costs
EN 1090 + ISO 9001 + ISO 3834 certified
Span up to 50 m without internal columns
Disassembly and relocation — possible

Structural Elements

8 elements. One hall.

Select an element — see where it sits in the structure.

01

Foundation

C25/30 · Anchor bolts M30
02

Columns

HEB 300-500 · S355JR
03

Roof beam

IPE 400-600 · Truss up to 60 m
04

Purlins

C/Z 200-250 · Spacing 1.5-2.5 m
05

Roof panels

PIR 60-120 mm · U=0.18 W/m²K
06

Wall panels

PIR 40-100 mm · or Ventilated
07

Gutter system

Galvanized sheet 0.6 mm
08

Industrial doors

Sectional/sliding · Up to 6×6 m
SPAN 12–50 m

Process

From call to finished building

Every step under one roof. No subcontractors. No surprises.

01

Inquiry & analysis

Dimensions, purpose, location, geotechnics.

02

3D blueprint — 24h

Free quote. Before you invest a single euro.

03

Structural calculation

Eurocode 3: wind, snow, seismic loads.

04

Production

EN 1090 facility. CNC cutting, welding, NDT inspection.

05

Corrosion protection

Hot-dip galvanizing 30-50 yrs or duplex 50+ yrs.

06

Transport

Own truck fleet. Special transport. EU-wide.

07

Assembly

15+ teams. 2 cranes. Geodetic control.

08

Handover

Final inspection. CE documentation. Warranty certificate.

Certified

What holds the structure —
is invisible. But provable.

Move your cursor to reveal details

EN 1090
Steel structure execution

European standard guaranteeing controlled quality at every production step. Mandatory for CE marking.

ISO 9001
Quality management

Management system ensuring process consistency and continuous improvement.

ISO 3834
Welding quality

International standard for quality requirements in welding of metallic materials.

CE
European conformity

Marking confirming the product meets all legal requirements of the EU market.

Time Comparison

Construction deadline — your competitive advantage.

Same building, two approaches, completely different outcome. Time you save = revenue you earn sooner.

Conventional construction (concrete)6–12 months
Design 4-8 wksConstruction 4-8 mo.Waiting...
RAKUŠIĆ Corporation2–3 months
Finished building ✓← 9 months of earlier revenue →
Green zone = Your profit that competitors don't have
5.000/mo.
9 months earlier =+€45.000

Activity

Everything is happening right now.

15+ teams. 10+ EU countries. Here's what we're doing while you read this.

Hall assembly 2400 m²
Marchtrenk, Austria
today
3D blueprint delivered to client
Zagreb, Croatia
2h ago
Beam transport 24 m
Đakovo → Zürich
4h ago
Portal frame production
EN 1090 facility, Đakovo
6h ago
Telecom tower assembly 42 m
Osijek, Croatia
yesterday
Solar substructure 1.2 MW
Vukovar, Croatia
yesterday

Sectors We Serve

Telecommunications
4G/5G infrastructure
Energy
Power lines, substations
Industry
Manufacturing plants, halls
Logistics
Warehouses, distribution
Agriculture
Farms, dryers, silos
Commercial
Shopping centers, offices
Renewable Energy
Solar substructures
Infrastructure
Bridges, canopies
Telecommunications
4G/5G infrastructure
Energy
Power lines, substations
Industry
Manufacturing plants, halls
Logistics
Warehouses, distribution
Agriculture
Farms, dryers, silos
Commercial
Shopping centers, offices
Renewable Energy
Solar substructures
Infrastructure
Bridges, canopies

FAQ

Frequently Asked Questions

Technical specifications, deadlines, certifications — all in one place.

Ready for your project? Let's start with a conversation.

Quote on your screen — tomorrow morning. Let's talk.

We respond within 24 hours · No obligation · Your data is secure