International projects & export

Steel structures from Croatia — for projects across Europe and worldwide

We design, fabricate to EN 1090 and deliver steel halls, structures and towers — 150+ projects completed. Our plant in Đakovo is about 400 km from the port of Rijeka, which has direct services to the Mediterranean and Asia.

Send an enquiry →☎ Call us
150+
projects
up to 50 m
column-free span
EN 1090
ISO 9001 · ISO 3834
EN · DE · HR
communication

Certificates & standards

Quality that crosses borders

EN 1090
Execution of steel structures — the basis for CE marking of structural steel components in the EU
ISO 9001
Quality management system
ISO 3834
Quality requirements for welding
Eurocode 3
Design of steel structures (EN 1993) with the national annex of the country of construction

For markets outside the EU/EEA we check the required standards and certification for each project before quoting.

Logistics

From Đakovo to the world’s oceans

Croatia’s Adriatic ports offer direct container services to Asia and terminals for long and heavy steel. Port and carrier are chosen for each project.

What fits in a container?

Enter the length of the longest element.

20′ · 5.89 m40′ · 12.03 mBreak-bulk or ro-ro0 m6 m12 m18 m24 m

40' / 40' HC or open top

Internal length 12,031 mm (open top 12,020 mm, top loading by crane).

Dimensions from ONE carrier tables; 40' payload about 26.7 t. Heavy plates and columns often reach the weight limit before the volume.

Distances from Đakovo (road, approx.)

Rijeka≈ 400 km · ≈ 4 h 20 min
Ploče (via Bosnia)≈ 420 km · ≈ 6 h 20 min
Koper / Trieste≈ 480 km · ≈ 5 h

Route calculation OpenStreetMap (OSRM), passenger car; trucks take longer.

Delivery terms are agreed under Incoterms® 2020. For containerised cargo the ICC explains why FCA is more suitable than FOB, which predates containers. ICC Academy

Ports for steel export (as of 1 Nov 2026)

⚓ Rijeka Gateway

deep-sea container terminal (APM Terminals)

  • 650,000 TEU a year, 400 m quay, 20 m depth
  • vessels up to 18,000 TEU; first vessel in September 2025
  • direct Asia – Adriatic service (Gemini AE12)
  • 53 % of cargo moved by rail in the first year

APM Terminals · Croatia Week

⚓ Adriatic Gate (AGCT), Rijeka

container terminal (ICTSI)

  • direct MSC services with the Far East (Hadria, Phoenix)
  • main berth 428 m

ICTSI port card · Container News

⚓ Port of Rijeka — general cargo

for long and heavy elements

  • officially handles iron products: sections, rails, steel plates and project cargo
  • two 84 t cranes working in tandem
  • ro-ro handling

Port of Rijeka 2026 · Terminals

⚓ Port of Ploče

south, Bosnia and Herzegovina, general cargo

  • general-cargo terminal for iron products
  • smaller feeder container terminal, ro-ro ramp

Container terminal · General cargo

Port and operator data with the sources given; schedules and services change — the actual route is confirmed by the carrier or forwarder.

Guide: containers, ports and Incoterms for steel export

How we work

From first enquiry to erection

  1. 01

    Enquiry in English or German

    Use, dimensions, location, deadline.

  2. 02

    3D proposal and quote

    Structure and outline scope.

  3. 03

    Engineering

    Design to Eurocode 3 and the national annex of the country of construction; in Switzerland on the basis agreed for the project (SIA or SN EN).

  4. 04

    Fabrication

    EN 1090, quality documentation for every element.

  5. 05

    Protection and packing

    Hot-dip galvanizing or paint; packing for road or sea.

  6. 06

    Delivery and erection

    Erection by our own teams in Croatia, Austria and Switzerland; other markets by agreement.

Frequently asked questions

Do you deliver steel structures outside Croatia?

Yes. We have 150+ projects and deliver across Europe. For markets outside the EU we check standards, documentation and erection requirements for each project before quoting.

Which port is used for export?

It depends on the destination. Rijeka has deep-sea container terminals with direct services to Asia and a general-cargo terminal for long steel elements; Ploče is an option for the south and Bosnia. Port and carrier are agreed for each project.

Do steel beams fit in a container?

Elements up to about 12 m fit in a 40' container (12,031 mm inside). Longer ones ship as break-bulk or ro-ro, and within Europe by road as an abnormal load.

Which certificates do you hold?

EN 1090, ISO 9001 and ISO 3834; design to Eurocode 3.

Which languages do you work in?

English, German and Croatian.

Planning a project outside Croatia?

Send the country, use, dimensions and deadline — we reply with the first steps and the delivery method.

Send an enquiry →☎ Call us