Logistics & Assembly

From facility to site. From blueprint to finished building.

Own transport • 15+ assembly teams • Cranes up to 500 t

When steel arrives on site — every element knows its place. Complete control without external subcontractors.

Last updated: 2026-03-16

15+
Assembly teams
500t
Max crane
3
EU countries
0
Subcontractors

Fleet

Transport without surprises.

Tractor + semi-trailer

Up to 24 t — standard profiles, panels

Low-loader trailer

Up to 40 t — tall elements, columns

Telescopic trailer

Up to 20 m — long beams, trusses

Delivery vans

Up to 3.5 t — bolts, tools, accessories

Assembly

Precision assembly. 5 phases.

01

Columns

Placement on anchor bolts, leveling, bracing.

02

Beams & girders

Crane, positioning, pre-tensioned 10.9 bolts.

03

Secondary elements

Purlins, bracing, crane beams, stairs.

04

Envelope

Sandwich panels roof→wall, gutters, seals.

05

Finishing

Touch-up anti-corrosion, cleaning, inspection, handover.

Vizualizacija montaže

Kako nastaje gotov objekt.

Odaberite korak — pratite kako se hala gradi.

Korak 05RoofSandwich panels or trapezoidal + insulation. Skylights, strip lights.

Safety

Safety is not optional. Safety is the first step.

Daily safety briefing
Protective equipment (helmet, harness, S3 boots)
Lift plan for every crane
Work stoppage at wind >15 m/s
Certificate for working at heights
ISO 45001 safety principles

FAQ

Frequently asked questions

15+ teams. 10+ EU countries. Your project is our project.

Logistics and assembly without compromise. Contact us.